Bill of Material


Check Our Bill of Material


The Bill of Material (BOM) feature in Mapsoft ERP is a comprehensive tool to manage the list of raw materials, sub-assemblies, and components required to produce finished goods. It helps in tracking production costs, managing inventory, and ensuring that all components are available when needed for production.

Bill of Material Overview
Bill of Material Overview

A Bill of Material (BOM) is a comprehensive list of the raw materials, parts, sub-assemblies, and components needed to manufacture a product. It provides information about the quantities required and links to inventory management, ensuring that all components are available for production.

  • Define multiple levels of BOM for complex assemblies
  • Track material quantities and ensure availability during production
  • Easy to update as product designs change
  • Integrate with inventory and procurement modules for seamless operations
Multi-Level Bill of Material

Mapsoft ERP supports multi-level BOMs, allowing you to define complex assemblies and sub-assemblies. This ensures that you can track every component from the raw materials to the finished product.

  • Create multi-level BOM structures for intricate products
  • Track sub-assemblies and their individual components
  • Automatically update BOM levels when changes are made
  • Efficiently manage component usage across multiple assemblies
Multi-Level BOM
BOM Costing
BOM Costing

Accurately track the cost of production by managing BOM costing. You can define material costs, labor, and overheads, enabling you to calculate the total cost of each product or assembly.

  • Calculate the direct cost of materials and components
  • Include labor and overhead costs in your BOM structure
  • Track cost fluctuations and adjust pricing strategies accordingly
  • Integrate with the financial module for seamless cost tracking
BOM & Inventory Management

Manage your inventory efficiently with the integration of BOM and inventory management. Ensure that raw materials are available for production without overstocking, and monitor stock levels in real time.

  • Track inventory levels based on BOM requirements
  • Automate stock replenishment for materials based on production needs
  • Monitor inventory costs and adjust stock levels accordingly
  • Reduce waste and optimize material usage with precise tracking
BOM Inventory Management
BOM Production Scheduling
BOM & Production Scheduling

Integrate your BOM data with production scheduling to ensure that the required materials are available when needed. This prevents delays and helps you meet production targets on time.

  • Align production schedules with material availability
  • Ensure timely procurement of raw materials based on BOM requirements
  • Optimize production efficiency with accurate scheduling
  • Track production progress and update BOM as production advances